Quote:
Originally Posted by jdegre
yeah, my results confirm that too!
engineering 20% -> intel 0%
if we were certain that intel > 0%, then the possibilities are:
with intel at 1% -> engineering 18%
(intel at 2%) -> no matches
with intel at 3% -> engineering 15%
but, i'll trust doer's data and i'll set intel at 0% and engineering at 20%.
|
Just, so I can understand it....
intel and engineering are connected?